Etec/OMS Vinyl Galvanics baths

fitted with Kraft rectifiers rated up to 200A

10”, 12” or 14” stamper possible.

Each bath is capable of producing a stamper in <90 minutes. 

The operator also has control of jig speed, temperature and dummy plating.

3 available

1 x Year 2018 € Sold Europe

1 x Year 2018 € Sold Europe

1 x Year 2020 € Sold Europe

Or

All 3 for €Sold

 

 

 

Ref 253478